首页 | 本学科首页   官方微博 | 高级检索  
   检索      


The macro nutrient removal efficiencies of a vertical flow constructed wetland fed with demineralized cheese whey powder solution
Authors:Yalcuk Arda
Institution:Abant Izzet Baysal University, Faculty of Engineering and Architecture, Department of Environmental Engineering, Bolu, Turkey. ayalcuk@gmail.com
Abstract:This study aims to remove the macro-sized nutrients that are present in the cheese whey powder solution through the use of constructed wetland systems. For this purpose, 70% and 40% demineralized solutions of cheese whey powder were used. For both concentrations, control reactors are run in parallel with Typha angustifolia planted reactors for the duration of a 92 day period. Zeolite and gravel were used as the filling material. The planted reactor, which was fed with the 70% solution, was named as Cheese Whey Powder Solution (CWPS) 1 and its unplanted control was named CWPS 2 while the reactor, which was fed with the 40% solution, was named as CWPS 3 and its unplanted control was named CWPS 4. The removal of COD, PO4-P and NH4-N were obtained as 37.47%, 45.62%, and 68.88% in CWPS 1; 24.89%, 35.74%, and 63.15% in CWPS 2; 51.15%, 54.96%, and 64.13% in CWPS 3; and 28.35%, 23.99%, and 65.92% in CWPS 4, respectively.
Keywords:cheese whey powder  constructed wetland  demineralization  Typha angustifolia  Zeolite
本文献已被 PubMed 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号