首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Upgrading of facultative waste stabilisation ponds under high organic load
Authors:FJ Avelar  P Martínez-Pereda  F Thalasso  R Rodríguez-Vázquez  FJ Esparza-García
Institution:(1) Departamento de Biotecnología y Bioingeniería, Centro de Investigación y de Estudios Avanzados del Instituto Politécnico Nacional, Apdo. Postal, 14-740, CP, 07000, México, DF;(2) Departamento de Ingeniería Ambiental, División de Estudios de Posgrado, Facultad de Ingeniería, Universidad Nacional Autónoma de México, Apdo. Postal, 70-256 C.U., CP, 04510, México, DF
Abstract:Wastewater treatment using laboratory scale waste stabilisation ponds enriched with activated sludge was studied. After enrichment, the efficiency of these ponds under high organic loading rates (i.e., up to 2800kg CODha–1day–1) reached a maximum COD removal rate of 970kg CODha–1day–1, which is from 2 to 10 times more than commonly reported values, and suggests that enrichment is an effective method to improve stabilisation ponds.
Keywords:bioflocs  enrichment procedure  waste stabilisation ponds  wastewater
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号