首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Biogas production from supernatant of hydrothermally treated municipal sludge by upflow anaerobic sludge blanket reactor
Authors:Qiao Wei  Peng Chong  Wang Wei  Zhang ZhongZhi
Institution:aCollege of Chemical Engineering, China University of Petroleum, Beijing 102249, China;bState Key Laboratory of Heavy Oil Processing, China University of Petroleum, Beijing 102249, China;cSchool of Environment, Tsinghua University, Beijing 100084, China
Abstract:The supernatant of hydrothermally treated sludge was treated by an upflow anaerobic sludge blanket (UASB) reactor for a 550-days running test. The hydrothermal parameter was 170 °C for 60 min. An mesophilic 8.6 L UASB reactor was seeded with floc sludge. The final organic loading rate (OLR) could reach 18 kg COD/m3 d. At the initial stage running for 189 days, the feed supernatant was diluted, and the OLR reached 11 kg COD/m3 d. After 218 days, the reactor achieved a high OLR, and the supernatant was pumped into the reactor without dilution. The influent COD fluctuated from 20,000 to 30,000 mg/L and the COD removal rate remained at approximately 70%. After 150 days, granular sludge was observed. The energy balance calculation show that heating 1.0 kg sludge needs 0.34 MJ of energy, whereas biogas energy from the supernatant of the heated sludge is 0.43 MJ.
Keywords:Biogas  Municipal sludge  Hydrothermal treatment  UASB
本文献已被 ScienceDirect PubMed 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号