首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Designing constructed wetlands for reclamation of pretreated wastewater and stormwater
Authors:Wendong Tao  Keshav Sauba  Kazi P Fattah  John R Smith
Institution:1.Department of Environmental Resources Engineering, College of Environmental Science and Forestry,State University of New York,Syracuse,USA;2.Department of Civil Engineering,American University of Sharjah,Sharjah,UAE;3.CES Clean Water LLC,Pittsburgh,USA
Abstract:Wastewater reclamation is getting greater attention as an alternative to conventional approaches to wastewater treatment and water supply due to increasing water stress coupled with more stringent water quality limitation for discharge of treated wastewater. Among the few technologies adopted in the field for wastewater reclamation, constructed wetlands have been used to reclaim both primary and secondary treated wastewater in regions with arid and humid climates. This paper summarizes the widely adopted guidelines that need to be considered when designing constructed wetlands for wastewater reclamation, discusses the capacity of wetland treatment systems for water reuse while assessing the status of full-scale constructed wetlands designed for wastewater reclamation, and develops contaminant loading charts as a design tool based on the performance of existing full-scale constructed wetlands deployed for wastewater reclamation. It is evident that constructed wetland systems provide a viable means to treat wastewater to the levels required for low-quality reuses such as restricted irrigation and impoundment. It is challenging for constructed wetlands to consistently meet microbiological guidelines for high-quality reuses such as unrestricted agricultural and urban reuses. Wastewater reclaimed through constructed wetlands is used mainly for agricultural and landscape irrigation, groundwater recharge, indirect potable reuse, and environmental reuse. Surface area and hydraulic loading rate of constructed wetlands to be deployed for wastewater reclamation can be estimated with contaminant loading charts derived from monitoring data of existing full-scale operations.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号