首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
We conducted systematic postproject appraisals (PPAs) of seven compound channel restoration projects, supplementing available data with new field data and analyses to produce comparable datasets for all seven projects. We describe how systematic PPAs can be developed and illustrate a systematic PPA for compound channel projects organized around performance with respect to geomorphic, habitat, and conveyance objectives. We found that preexisting monitoring programs for a group of similar restoration projects can be supplemented with relatively low‐effort data collection and analyses to produce lessons on a “class” of restoration projects. Using this approach to assess a set of seven compound channel projects, we found that two fully achieved geomorphic objectives, three appear likely to achieve geomorphic objectives with additional time and/or minor interventions, and two did not achieve geomorphic objectives. Further, four projects achieved habitat objectives and three projects appeared likely to achieve objectives if given more time to develop and/or a minor intervention to mitigate limitations on critical ecological processes. Finally, four of the projects satisfied conveyance objectives, and the remaining three appeared likely to satisfy objectives with minor interventions to maintain design roughness and geometry conditions. Based on observations from our new systematic PPA approach applied to compound channels in Mediterranean climates, we suggest application of systematic PPAs for other classes of river restoration projects to evaluate scale and geomorphic setting issues in project design, to refine postproject monitoring guidelines, and to predict vegetation recruitment, growth, and succession patterns to avoid potential vegetation problems.  相似文献   

2.
Despite expenditures of more than 1 billion dollars annually, there is little information available about project motivations, actions, and results for the vast majority of river restoration efforts. We performed confidential telephone interviews with 317 restoration project managers from across the United States with the goals of (1) assessing project motivations and the metrics of project evaluation and (2) estimating the proportion of projects that set and meet criteria for ecologically successful river restoration projects. According to project managers, ecological degradation typically motivated restoration projects, but post‐project appearance and positive public opinion were the most commonly used metrics of success. Less than half of all projects set measurable objectives for their projects, but nearly two‐thirds of all interviewees felt that their projects had been “completely successful.” Projects that we classified as highly effective were distinct from the full database in that most had significant community involvement and an advisory committee. Interviews revealed that many restoration practitioners are frustrated by the lack of funding for and emphasis on project monitoring. To remedy this, we recommend a national program of strategic monitoring focused on a subset of future projects. Our interviews also suggest that merely conducting and publishing more scientific studies will not lead to significant improvements in restoration practice; direct, collaborative involvement between scientists, managers, and practitioners is required for forward progress in the science and application of river restoration.  相似文献   

3.
Although many restoration projects now include monitoring and evaluation in an adaptive management approach, a failure to employ distinct performance standards can lead to inconsistent and unclear results that may hinder learning from project outcomes and complicate large‐scale assessments of restoration success. Such is the case with vernal pool restoration projects in California, where performance standard guidelines are vague and inconsistently applied across agencies implementing restoration projects. However, positive steps have been made in recent years to develop wetland functional assessments and monitoring protocols in California to reduce inconsistencies and promote ecologically meaningful restoration. Additional work is needed to develop specific guidelines for vernal pool restoration performance standards and define their role within an adaptive management framework. We provide a case study of a vernal pool restoration project in central California to illustrate some of the challenges in using currently available vernal pool performance standard guidelines and propose suggestions for increasing their ecological relevance and clarity.  相似文献   

4.
The Society for Ecological Restoration (SER) Primer identifies key ecosystem attributes for evaluating restoration outcome. Broad attribute categories could be necessary due to the large variety of restoration projects, but could make overall evaluations and assessments challenging and might hamper the development of sound and successful restoration. In this study we carry out a systematic review of scientific papers addressing evaluation of restoration outcome. We include 104 studies published after 2010 from Europe or North America, representing different types of restoration projects in terrestrial and freshwater ecosystems. We explore the main ecological and socioeconomic attributes used to evaluate restoration outcome, and related indicators and specific methods applied to measure this, in relation to ecosystem and type of restoration project. We identify a wide range of indicators within each attribute, and show that very different methods are employed to measure them. This complexity reduces the opportunity for meaningful comparison and standardization of evaluation of restoration outcome, within and between ecosystems. Socioeconomic indicators are rarely used to evaluate restoration outcome, and studies including both ecological and socioeconomic indicators are nearly absent. Based on our findings we discuss whether standardization and streamlining of indicators is useful to improve the evaluation of “on the ground” restoration, or if this is not appropriate given the diversity of goals and ecosystems involved. Species‐specific traits are used in many projects and should be considered as an addition to the original SER attributes. Furthermore, we discuss the potential for restoration evaluation that encompasses not only assessment of ecological but also socioeconomic indicators.  相似文献   

5.
1. This paper introduces key messages from a number of papers emanating from the Second International Symposium on Riverine Landscapes held in August 2004 in Sweden, focusing on river restoration. Together these papers provide an overview of the science of river restoration, and point out future research needs. 2. Restoration tests the feasibility of recreating complex ecosystems from more simple and degraded states, thereby presenting a major challenge to ecological science. Therefore, close cooperation between practitioners and scientists would be beneficial, but most river restoration projects are currently performed with little or no scientific involvement. 3. Key messages emanating from this series of papers are: The scope, i.e. the maximum and minimum spatial extent and temporal duration of habitat use, of species targeted for restoration should be acknowledged, so that all relevant stages in their life cycles are considered. Species that have been lost from a stream cannot be assumed to recolonise spontaneously, calling for strategies to ensure the return of target species to be integrated into projects. Possible effects of invasive exotic species also need to be incorporated into project plans, either to minimise the impact of exotics, or to modify the expected outcome of restoration in cases where extirpation of exotics is impractical. 4. Restoration of important ecological processes often implies improving connectivity of the stream. For example, longitudinal and lateral connectivity can be enhanced by restoring fluvial dynamics on flood‐suppressed rivers and by increasing water availability in rivers subject to water diversion or withdrawal, thereby increasing habitat and species diversity. Restoring links between surface and ground water flow enhances vertical connectivity and communities associated with the hyporheic zone. 5. Future restoration schemes should consider where in the catchment to locate projects to make restoration most effective, consider the cumulative effects of many small projects, and evaluate the potential to restore ecosystem processes under highly constrained conditions such as in urban areas. Moreover, restoration projects should be properly monitored to assess whether restoration has been successful, thus enabling adaptive management and learning for the future from both successful and unsuccessful restorations.  相似文献   

6.
Across the Pacific Northwest (PNW), both public and private agents are working to improve riverine habitat for a variety of reasons, including improving conditions for threatened and endangered salmon. These projects are moving forward with little or no knowledge of specific linkages between restoration actions and the responses of target species. Targeted effectiveness monitoring of these actions is required to redress this lack of mechanistic understanding, but such monitoring depends on detailed restoration information—that is, implementation monitoring. This article describes the process of assembling a database of restoration projects intended to improve stream and river habitat throughout the PNW. We designed the database specifically to address the needs of regional monitoring programs that evaluate the effectiveness of restoration actions. The database currently contains spatially referenced, project‐level data on over 23,000 restoration actions initiated at over 35,000 locations in the last 15 years (98% of projects report start or end dates between 1991 and 2005) in the states of Washington, Oregon, Idaho, and Montana. Data sources included federal, state, local, nongovernmental organization, and tribal contributors. The process of database production identified difficulties in the design of regional project tracking systems. The technical design issues range from low‐level information such as what defines a project or a location to high‐level issues that include data validation and legalities of interagency data sharing. The completed database will inform efficient monitoring design, effectiveness assessments, and restoration project planning.  相似文献   

7.
8.
Over the past decade, restoration of the Kissimmee River in central Florida has received considerable attention from local, state, national, and international media. In terms of areal extent, project cost, and ecological evaluation it is one of the largest and most comprehensive river restoration projects in the world. The goal of reestablishing ecological integrity involves restoring the physical attributes and the hydrologic processes that were lost after channelization of the river in the 1960s. The project is expected to restore over 80 km2 of floodplain wetlands and reestablish over 70 km of river channel. Restoration construction began in 1999; to date, three construction phases have been completed, with the final phase of construction slated for completion in 2019. Restoration evaluation is widely viewed as a critical component of any restoration project. Equally important is the dissemination of information gained from restoration evaluation programs. This introductory article presents a brief overview of project history and outlines the approach and logic of the Kissimmee River Restoration Evaluation Program. The following papers present the results of ecological studies conducted before and after completion of the first phase of restoration construction. This first phase reestablished flow through 23 km of reconnected river channels and seasonally inundated a large portion (approximately 2,900 ha) of the floodplain within the Phase I project area. Although these studies present interim responses prior to full hydrologic restoration, results suggest that the ecosystem is responding largely as predicted by performance measures developed prior to restoration construction.  相似文献   

9.
The effects of river restoration on hydromorphological conditions and variability are often documented immediately following the restoration, but rarely properly monitored in the long term. This study assesses outcomes of 20 restoration projects undertaken across central and northern Europe for a comprehensive set of hydromorphological parameters, quantified at both larger and smaller spatial scales. For each project, we compared a restored river section to an upstream degraded section. Ten pairs of large projects were contrasted to ten similar but less extensive projects, to address the importance of restoration extent for the success of each project. Overall, river restoration increased habitat diversity through changes in channel morphology. Our results indicated that restoration particularly improved macro- and mesohabitat diversity, but had a limited effect on microhabitat conditions, including the diversity of substrates. We found no significant difference in effects between large and small restoration projects. Our results reveal the need to assess hydromorphological parameters which reflect processes occurring at different spatial scales, including indicators of larger-scale hydromorphological processes such as bank erosion, to monitor restoration effects effectively and accurately. Additionally, our results demonstrate the importance of developing terrestrial parameters, to assess the lateral dimension of river restoration.  相似文献   

10.
This article presents an interdisciplinary, on‐campus, student project, titled “The Rain Project” that I designed as an urban ecosystem restoration model as well as a collaborative pedagogical approach between ecological science and art at George Mason University (GMU), Virginia, U.S.A. A group of students from several disciplines (e.g. environmental science, art, civil engineering, biology, communication, and film/media) participated in designing and constructing a floating wetland for a campus stormwater pond as part of sustainable stormwater management. The Rain Project has numerous implications for college education, scholarship, and service while presenting a novel way of building a sense of community among undergraduate students for ecological awareness and literacy. The work of Jackie Brookner, a renowned eco‐artist who worked extensively on stormwater, and its relevance to the project is discussed. I strongly suggest the need for linking art and the science of ecosystem restoration to best obtain improvements in much‐needed communication for the success of community participatory restoration projects. I also believe that this kind of interdisciplinary, campus project can facilitate the changes we need to train higher education students to be able to both think differently and communicate effectively. The Rain Project introduced students to new learning strategies that connected “systems thinking” with art, ecological science, and restoration practices.  相似文献   

11.
An increasing number of rivers have been restored over the past decades and several studies investigated the effect on biota. The published monitoring results have already been summarized in narrative reviews but there are few quantitative reviews and a comprehensive meta-analysis on different organism groups and factors influencing restoration effect is missing. We compiled monitoring results and information on catchment, river and project characteristics from peer-reviewed literature and unpublished databases to (i) quantify the effect of restoration measures on fish, macroinvertebrates and macrophytes, and (ii) identify predictors which influence restoration effect. Results indicated significant effects of restoration on all three organism groups, especially of widening projects on macrophyte richness/diversity, instream measures on fish and macroinvertebrates, and higher effects on abundance/biomass compared to richness/diversity. Restoration effect was most strongly affected by agricultural land use, river width and project age. Effects were smaller but restoration generally still increased richness/diversity and abundance/biomass in agricultural catchments. Since land use is a proxy for different pressures, the underlying causal relationships have to be investigated in more detail. Project age was the most important factor but had non-linear and even negative effects on restoration outcome, indicating that restoration effects may vanish over time. The meta-analysis indicated that river managers in general can expect an increase of richness/diversity and abundance/biomass of all three organism groups investigated, especially of macrophytes in widening projects and of fish and macroinvertebrates if instream measures are applied. However, variability was high, stressing the need for adaptive management approaches. Furthermore, the large but non-linear and different (even negative) effects of project age stressed the need for long-time monitoring to better understand the trajectories of change caused by restoration measures and to identify sustainable measures. The meta-analysis was restricted to metrics commonly reported in literature and future studies would greatly benefit from authorities and scientists reporting original monitoring data, which would allow to use functional metrics to investigate the effect of restoration measures and to infer causal relationships.  相似文献   

12.
Developing quantitative ecosystem–scale expectations of habitat restoration projects and examining trade‐offs associated with alternative approaches has been a challenge for restoration ecology. Many of the largest freshwater lake restoration projects have occurred in Florida to remediate degradation to vegetated littoral habitats resulting from stabilized water levels, but effects across lake food‐webs have not been assessed. We developed an ecosystem model using Ecopath with Ecosim and Ecospace for a generalized large, eutrophic Florida Lake to explore how simulated restoration activities could influence fish communities with emphasis on sport fish abundance. We modeled three habitat restoration scenarios: (1) “no control,” (2) a “10‐year control” that restored littoral habitat every 10 years, and (3) a “combined control” scenario that restored littoral habitat every 10 years with maintenance controls between 10‐year periods. Our “combined control” scenario provided the largest long‐term habitat restoration benefits for sport fish abundance and the fisheries they support. In Ecospace, we simulated a littoral habitat restoration project that reduced lake‐wide tussock coverage from 30 to 15%. Ecospace predicted positive benefits to sport fish and fisheries following the restoration simulation and highlighted the importance of habitat edge effects, spatial design of habitat restoration projects, and sampling designs for evaluating restoration projects.  相似文献   

13.
Stream restoration projects have become increasingly common, and the need for systematic post‐project evaluation, particularly for small‐scale projects, is evident. This study describes how a 70‐m restored reach of a small urban stream, Baxter Creek (in Poinsett Park, El Cerrito, California), was quickly and inexpensively evaluated using habitat, biological, and resident‐attitude assessments. The restoration involved opening a previously culverted channel, planting riparian vegetation, and adding in‐stream step‐pool sequences and sinuosity. Replicated benthic macroinvertebrate samples from the restored site and an upstream unrestored site were compared using several metrics, including taxa richness and a biotic index. Both biological and habitat quality improved in the restored compared with the unrestored section. However, when compared with a creek restored 12 years before, habitat condition was of lower quality in the recently restored creek. A survey of the neighborhood residents indicated that, overall, they were pleased with the restored creek site. The approach used in this demonstration project may be applicable to other small‐scale evaluations of urban stream restorations.  相似文献   

14.
The conservation of biodiversity in highly fragmented landscapes often requires large‐scale habitat restoration in addition to traditional biological conservation techniques. The selection of priority restoration sites to support long‐term persistence of biodiversity within landscape‐scale projects however remains a challenge for many restoration practitioners. Techniques developed under the paradigm of systematic conservation planning may provide a template for resolving these challenges. Systematic conservation planning requires the identification of conservation objectives, the establishment of quantitative targets for each objective, and the identification of areas which, if conserved, would contribute to meeting those targets. A metric developed by systematic conservation planners termed “irreplaceability” allows for analysis and prioritization of such conservation options, and allows for the display of analysis results in a way that can engage private landowners and other decision makers. The process of systematic conservation planning was modified to address landscape‐level restoration prioritization in southern Ontario. A series of recent and locally relevant landscape ecology studies allowed the identification of restoration objectives and quantitative targets, and a simple algorithm was developed to identify and prioritize potential restoration projects. The application of an irreplaceability analysis to landscape‐level restoration planning allowed the identification of varying needs throughout the planning region, resulting from underlying differences in topography and settlement patterns, and allowed the effective prioritization of potential restoration projects. Engagement with rural landowners and agricultural commodity groups, as well as the irreplaceability maps developed, ultimately resulted in a substantial increase in the number and total area of habitat restoration projects in the planning region.  相似文献   

15.
Although public and financial support for stream restoration projects is increasing, long‐term monitoring and reporting of project successes and failures are limited. We present the initial results of a long‐term monitoring program for the Lower Red River Meadow Restoration Project in north‐central Idaho, U.S.A. We evaluate a natural channel design’s effectiveness in shifting a degraded stream ecosystem onto a path of ecological recovery. Field monitoring and hydrodynamic modeling are used to quantify post‐restoration changes in 17 physical and biological performance indicators. Statistical and ecological significance are evaluated within a framework of clear objectives, expected responses (ecological hypotheses), and performance criteria (reference conditions) to assess post‐restoration changes away from pre‐restoration conditions. Compared to pre‐restoration conditions, we observed ecosystem improvements in channel sinuosity, slope, depth, and water surface elevation; quantity, quality, and diversity of in‐stream habitat and spawning substrate; and bird population numbers and diversity. Modeling documented the potential for enhanced river–floodplain connectivity. Failure to detect either statistically or ecologically significant change in groundwater depth, stream temperature, native riparian cover, and salmonid density is due to a combination of small sample sizes, high interannual variability, external influences, and the early stages of recovery. Unexpected decreases in native riparian cover led to implementation of adaptive management strategies. Challenges included those common to most project‐level monitoring—isolating restoration effects in complex ecosystems, securing long‐term funding, and implementing scientifically rigorous experimental designs. Continued monitoring and adaptive management that support the establishment of mature and dense riparian shrub communities are crucial to overall success of the project.  相似文献   

16.
Several ambitious restoration targets have been set for recovering degraded ecosystems in Brazil (21 million hectares with a legal deficit of native vegetation). The development of scientific knowledge and skilled professionals is necessary to meet this demand and is fundamental for achieving success in medium‐ and long‐term restoration. In this study, we describe the availability and profile of postgraduate courses on ecological restoration in Brazil. We surveyed 272 postgraduate programs, comprising six specific areas of concentration (forestry, soil sciences, botany, environmental engineering, ecology, and environmental science). We analyzed all selected courses in terms of location, approach (economic, social, and legal), and restoration techniques. Only 27% of the postgraduate programs analyzed offer ecological restoration courses, and 49% of these are offered in the southeast region of the country. Regions covered by nonforest ecosystems, such as Pampas, Caatinga, and Pantanal, were poorly represented. Legal aspects were considered in 51% of the courses, whereas social and economic approaches were only considered in 2.7 and 11% of the courses, respectively. Seedling planting (85%) and nucleation (68%) were the most frequently cited techniques of active restoration, and passive restoration was mentioned in 63% of the courses. Our findings highlight the need for increasing postgraduate courses in areas with nonforest ecosystems, especially due to a lack of knowledge about restoration of these areas. The incorporation of economic and social approaches is highly recommended, considering the importance of these attributes in achieving success in large‐scale restoration initiatives.  相似文献   

17.
Despite some highly visible projects that have resulted in environmental benefits, recent efforts to quantify the number and distribution of river restoration projects revealed a paucity of written records documenting restoration outcomes. Improving restoration designs and setting watershed priorities rely on collecting and making accessible this critical information. Information within the unpublished notes of restoration project managers is useful but rarely documents ecological improvements. This special section of Restoration Ecology is devoted to the current state of knowledge on river restoration. We provide an overview of the section’s articles, reflecting on lessons learned, which have implications for the implementation, legal, and financing frameworks for restoration. Our reflections are informed by two databases developed under the auspices of the National River Restoration Science Synthesis project and by extensive interactions with those who fund, implement, and permit restoration. Requiring measurable ecological success criteria, comprehensive watershed plans, and tracking of when and where restoration projects are implemented are critical to improving the health of U.S. waters. Documenting that a project was put in the ground and stayed intact cannot be equated with ecological improvements. However, because significant ecological improvements can come with well‐designed and ‐implemented stream and river restorations, a small investment in documenting the factors contributing to success will lead to very large returns in the health of our nation’s waterways. Even projects that may appear to be failures initially can be turned into success stories by applying the knowledge gained from monitoring the project in an adaptive restoration approach.  相似文献   

18.
A global ecological restoration agenda has led to ambitious programs in environmental policy to mitigate declines in biodiversity and ecosystem services. Current restoration programs can incompletely return desired ecosystem service levels, while resilience of restored ecosystems to future threats is unknown. It is therefore essential to advance understanding and better utilize knowledge from ecological literature in restoration approaches. We identified an incomplete linkage between global change ecology, ecosystem function research, and restoration ecology. This gap impedes a full understanding of the interactive effects of changing environmental factors on the long‐term provision of ecosystem functions and a quantification of trade‐offs and synergies among multiple services. Approaches that account for the effects of multiple changing factors on the composition of plant traits and their direct and indirect impact on the provision of ecosystem functions and services can close this gap. However, studies on this multilayered relationship are currently missing. We therefore propose an integrated restoration agenda complementing trait‐based empirical studies with simulation modeling. We introduce an ongoing case study to demonstrate how this framework could allow systematic assessment of the impacts of interacting environmental factors on long‐term service provisioning. Our proposed agenda will benefit restoration programs by suggesting plant species compositions with specific traits that maximize the supply of multiple ecosystem services in the long term. Once the suggested compositions have been implemented in actual restoration projects, these assemblages should be monitored to assess whether they are resilient as well as to improve model parameterization. Additionally, the integration of empirical and simulation modeling research can improve global outcomes by raising the awareness of which restoration goals can be achieved, due to the quantification of trade‐offs and synergies among ecosystem services under a wide range of environmental conditions.  相似文献   

19.
Of 311 papers on wetland restoration, only 15 concerned large‐scale experimentation in restoration sites. Most papers described what happened, reported on small field experiments, or discussed restoration targets. While these are important topics, our opinion is that we lose significant opportunities to learn how to recover populations, community structure, and ecosystem processes, and we limit our ability to document variability and whole‐system responses, when we do not experiment at large scales. We suggest that, wherever possible, large projects facilitate field tests of alternative restoration approaches. Furthermore, we encourage researchers to take advantage of major restoration efforts by conducting large field experiments, assessing multiple responses, and offering restoration guidance in an adaptive framework.  相似文献   

20.
Although the importance of monitoring and evaluation of restoration actions is increasingly acknowledged, availability of accurate, quantitative monitoring data is very rare for most restoration areas, particularly for long‐established restoration projects. We propose using fuzzy rule‐based expert systems to evaluate the degree of success of restoration actions when available information on project results and impacts largely relies on expert‐based qualitative assessments and rough estimates of quantitative values. These systems use fuzzy logic to manage the uncertainty present in the data and to integrate qualitative and quantitative information. To illustrate and demonstrate the potential of fuzzy rule‐based systems for restoration evaluation, we applied this approach to seven forest restoration projects implemented in Spain between 1897 and 1952, using information compiled in the REACTION database on Mediterranean forest restoration projects. The information available includes both quantitative and expert‐based qualitative data, and covers a wide variety of indicators grouped into technical, structural, functional, and socioeconomic criteria. The fuzzy rule‐based system translates expert knowledge of restoration specialists and forest managers into a set of simple logic rules that integrate information on individual indicators into more general evaluation criteria. The rule‐based approach proposed here can be readily applicable to any kind of restoration project, provided that some information, even if vague and uncertain, is available for a variety of assessment indicators. The evaluation of long‐established forest restoration projects implemented in Spain revealed important asymmetries in the degree of restoration success between technical, structural, functional, and socioeconomic criteria.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号