首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
The present paper reports the results of the application of a control system, based on artificial intelligence concepts, for the automation of a bench-scale SBR treating leachate generated in old landfills. Attention was given to the nitritation and denitritation processes in order to enhance the nitrogen removal efficiency. Nitrification and nitrogen removal were usually higher than 98% and 95%, respectively, whereas COD removal was approximately 20-30% due to the low biodegradability of organic matter in the leachate from old landfills; therefore, external COD was added to accomplish the denitrification process. Adjusting the length of the oxic phase, almost complete inhibition of the nitrite oxidizing organisms was observed. The results confirm the effectiveness of the nitrite route for nitrogen removal optimisation in leachate treatment. A significant saving of approximately 35% in external COD addition was achieved.  相似文献   

2.
An optimal operating mode for a sequencing batch reactor was determined via a model-based optimization. Synthetic wastewater containing mainly organic matter (as glucose) and nitrogen (as ammonium chloride) was treated without any addition of an external carbon source to accomplish denitrification step. A simplified model was used to describe process dynamics, comprised of six ordinary differential equations and an empirical correlation for oxygen consumption rate. Batch cycle time was the chosen objective function to be minimized for a fixed volume of waste to be treated. Furthermore, as SBR operation is divided in two major phases - aerobic and anoxic, to achieve total pollutants removal within minimum time, these phases can be repeatedly alternated. To ensure availability of organic matter necessary for denitrification, these two phases were combined with feed steps. Different feed strategies were tested using one, two or three feed steps. A successive quadratic programming algorithm was used, and maximum values for final COD, nitrate and ammonium concentrations, as well as maximum feed pump flow rate were some the process constraints. One step feed strategy was indicated by the optimization leading to a batch cycle time of 5h.  相似文献   

3.
4.
Zeng W  Yang Y  Li L  Wang X  Peng Y 《Bioresource technology》2011,102(12):6657-6664
Although nitrite effect on enhanced biological phosphorus removal (EBPR) has been previously studied, very limited research has been undertaken about the effect of nitrite accumulation caused by nitritation on EBPR. This paper focused on nitrite effect from nitritation on EBPR in a sequencing batch reactor treating domestic wastewater. Results showed that nitrite of below 10 mg/L did not inhibit P-uptake and release; whereas EBPR deterioration was observed when nitrite accumulation reached 20 mg/L. Due to P-uptake prior to nitritation, nitrite of 20 mg/L has no effect on aerobic P-uptake. The main reason leading to EBPR deterioration was the competition of carbon source. Batch tests were conducted to investigate nitrite effect on anaerobic P-release. Under sufficient carbon source, nitrite of 30 mg/L had no impact on poly-β-hydroxyalkanoate (PHA) storage; contrarily, under insufficient carbon source, denitrifiers competing for carbon source with phosphorus accumulating organisms resulted in decrease of PHA synthesis and P-release.  相似文献   

5.
A sequencing batch reactor (SBR) system is demonstrated to biologically remove nitrogen, phosphorus and chemical oxygen demand (COD) to very low levels from abattoir wastewater. Each 6 h cycle contained three anoxic/anaerobic and aerobic sub-cycles with wastewater fed at the beginning of each anoxic/anaerobic period. The step-feed strategy was applied to avoid high-level build-up of nitrate or nitrite during nitrification, and therefore to facilitate the creation of anaerobic conditions required for biological phosphorus removal. A high degree removal of total phosphorus (>98%), total nitrogen (>97%) and total COD (>95%) was consistently and reliably achieved after a 3-month start-up period. The concentrations of total phosphate and inorganic nitrogen in the effluent were consistently lower than 0.2 mg P l−1 and 8 mg N l−1, respectively. Fluorescence in situ hybridization revealed that the sludge was enriched in Accumulibacter spp. (20–40%), a known polyphosphate accumulating organism, whereas the known glycogen accumulating organisms were almost absent. The SBR received two streams of abattoir wastewater, namely the effluent from a full-scale anaerobic pond (75%) and the effluent from a lab-scale high-rate pre-fermentor (25%), both receiving raw abattoir wastewater as feed. The pond effluent contained approximately 250 mg N l−1 total nitrogen and 40 mg P l−1 of total phosphorus, but relatively low levels of soluble COD (around 500 mg l−1). The high-rate lab-scale pre-fermentor, operated at 37°C and with a sludge retention time of 1 day, proved to be a cheap and effective method for providing supplementary volatile fatty acids allowing for high-degree of biological nutrient removal from abattoir wastewater.  相似文献   

6.
Accumulation of nitrite occurred during the aerobic phase of a sequencing batch reactor (SBR) operating to remove nitrogen from synthetic waste water. Although present, heterotrophic nitrifiers were not involved in the nitrification of the SBR. The activity of autotrophic nitrite oxidizers was reduced in the SBR where free ammonia was the main inhibitor for the nitrite oxidation. Nitrite build-up in the SBR was reduced when the aerobic phase was extended. All the ammonia could be oxidized when the aerobic phase was longer than four hours. The accumulated nitrite and nitrate were removed completely in the post-anoxic phase.  相似文献   

7.
Simultaneous removal of phosphorus and nitrogen in sequencing batch reactor   总被引:1,自引:0,他引:1  
In this research, investigations were made on material transfer mechanisms and optimum operation mode for sequencing batch reactor system removing phosphorus and nitrogen simultaneously. Phosphorus release characteristics were expressed in the Monod equation, in which the reaction rate was replaced with specific phosphorus release (SPR) rate. The rate of SPR was increased during the first 80 days, but increased sharply to reach 0.003 hr-1 afterwards. Phosphorus removal efficiencies were about 60% in the first 80 days, 75% after 80 days, and above 95% after 120 days. After 120 days, phosphorus concentration in effluent was below 0.5 mgl-1 when 8 mgl-1 was in the influent and the released phosphorus after 3-hour-anaerobic period was 60 mgl-1. In the proposed optimum operation strategy (2-hour anaerobic react, 3-hour aerobic react, 4-hour anoxic react, and 3-hour settle and draw), phosphorus reappeared if the oxidized nitrogen was completely denitrified. In order to prevent this undesirable phosphorus release, anoxic period should be reduced to the extent of which the minimal concentration of the oxidized nitrogen existed. Phosphorus removal efficiency was stable under shock load as 5 times high as normal phosphorus concentration.Abbreviations dP/dt Phosphorus release rate (mgl-1 hr-1) - K Phosphorus release yield constant (mg P mg TOC-1) - dS/dt Substrate utilization rate (mgl-1 hr-1) - X Mixed liquor suspended solid (MLSS, mgl-1) - S Soluble TOC (mgl-1) - k-qmax (Ymax)-1 Maximum substrate utilization rate - Y Yield coefficient (mg mg-1) - Ks Saturation constant (mgl-1) - Pmax kK-Maximum phosphorus release rate (hr-1) - Prel Total released phosphorus (mgl-1) - Po Phosphorus in influent (mgl-1) - Pe phosphorus in effluent (mgl-1) - t Anaerobic period (hr)  相似文献   

8.
Bioprocess and Biosystems Engineering - The shortcut biological nitrogen removal (SBNR) process requires less aeration and external carbon due to the oxidization of ammonia into nitrite and its...  相似文献   

9.
Summary The effects of nitrate on phosphorus release and uptake in a sequencing batch reactor for biological phosphorus removal was investigated. The addition of nitrate decreased phosphorus release in the anaerobic stage. The synthesis of poly(hydroxyalkanoates) was decreased with the presence of nitrate, possibly due to the competitive utilization of the carbon source by PHA synthesis and denitrification of nitrate. Instead of oxygen, nitrate could be used as an electron acceptor for phosphorus removal. However, the simultaneous addition of nitrate and acetate greatly reduced the phosphorus removal rate. Phosphate and nitrate could be removed simultaneously with nitrate as the electron acceptor, and the continuous and steady feeding of nitrate was beneficial to phosphate removal.  相似文献   

10.
Nutrient removal from synthetic wastewater was investigated using a four-step sequencing batch reactor (SBR) at different phenol (C6H5OH) concentrations in order to determine the inhibition effects of phenol on biological nutrient removal. The nutrient removal process consisted of anaerobic, oxic, anoxic, and oxic phases with hydraulic residence times (HRT) of 1 h/3 h/1 h/1 h and a settling phase of 3/4 h. Solids retention time (SRT) was kept constant at 10 days in all experiments. Initial phenol concentrations were varied between 0 and 600 mg l−1 at seven different levels. The effects of phenol on COD, NH4-N, and PO4-P removals and effluent nutrient levels were investigated. Phenol was almost completely degraded up to 400 mg l−1 phenol concentration resulting in almost negligible inhibition effects on COD, NH4-N, and PO4-P removals. Nutrient removals were adversely affected by phenol at concentrations above 400 mg l−1. Above 95% COD, 90% NH4-N and 65% PO4-P removal was obtained for phenol concentrations below 400 mg l−1. The sludge volume index (SVI) was almost constant around 45 ml g−1 for phenol concentrations below 400 mg l−1 but increased to 90 ml g−1 at a phenol level of 600 mg l−1.  相似文献   

11.
The information of nutrient dynamics is essential for the precise control of effluent quality discharged from biological wastewater treatment processes. However, these variables can usually be determined with a significant time delay. Although the final effluent quality can be analyzed after this delay, it is often too late to make proper adjustments. In this paper, a neural network approach, a software sensor, was proposed for the real-time estimation of nutrient concentrations and overcoming the problem of delayed measurements. In order to improve the neural network performance, a split network structure applied separately for anaerobic and aerobic conditions was employed with dynamic modeling methods such as auto-regressive with exogenous inputs. The proposed methodology was applied to a bench-scale sequencing batch reactor (SBR) for biological nutrient removal. The extrapolation problem of neural networks was possible to be partially overcome with the aid of multiway principal component analysis because of its ability of detecting of abnormal situations which could generate extrapolation. Real-time estimation of PO43−, NO3 and NH4+ concentrations based on neural network was successfully carried out with the simple on-line information of the SBR system only.  相似文献   

12.
A laboratory-scale sequencing batch reactor was started-up with flocculated biomass and operated primarily for enhanced biological phosphate removal. Ten weeks after the start-up, gradual formation of granular sludge was observed. The compact biomass structure allowed halving the settling time, the initial reactor volume, and doubling the influent COD concentration. Continued operation confirmed the possibility of maintaining a stable granular biomass with a sludge volume index less than 40 ml g–1, while securing a removal efficiency of 95% for carbon, 99.6% for phosphate, and 71% for nitrogen. Microscopic observations revealed a morphological diversity.  相似文献   

13.
The purpose of this work was to determine optimum sequence retention times for nutrient removal with low-cost using very short aeration time in an SBR treating domestic wastewater. During the study, four different CYCLEs were evaluated, with the highest removal efficiencies recorded for the CYCLE with fill, anaerobic, aerobic1, anoxic, aerobic2, settle, and decant sequences operated at retention times of 0.5, 2, 2, 1, 0.75, 1, and 0.5 h, respectively. For this CYCLE, the removal efficiencies of chemical oxygen demand (COD), total Kjeldahl nitrogen (TKN), ammonia nitrogen (NH3–N), total phosphorus (TP), and ortho-phosphate (PO4–P) were found, on average, to be 91, 78, 85, 87, and 83%, respectively. The optimum sequence retention time was determined via the analysis of variance (ANOVA) using the Matlab software (Mathworks Inc.). The data indicated that the total time of the aerobic sequences was shorter than those of previous studies for similar level of removal efficiencies in all parameters including N and P.  相似文献   

14.
Sequencing batch operation was used for nutrient (COD, NH4-N, NO3-N, PO4-P) removal from synthetic wastewater by using different carbon sources. Operation consisted of anaerobic, anoxic, oxic, anoxic and oxic (An/Ax/Ox/Ax/Ox) phases with durations of 2/1/4.5/1.5/1.5 h. Glucose, acetate and a mixture of glucose/acetate were used as carbon source to yield a COD/N/P ratio of 100/5/1.5 in the feed. Sludge age was kept constant at 10 days. COD, NH4-N, NO3-N and PO4-P removal efficiencies were maximum at the levels of 96%, 87%, 81% and 90% respectively, when a mixture (50/50) of glucose and acetate was used.  相似文献   

15.
Biological removal of nitrogen is a two-step process: aerobic autotrophic microorganisms oxidize ammoniacal nitrogen to nitrate, and the nitrate is further reduced to elementary nitrogen by heterotrophic microorganisms under anoxic condition with concomitant organic carbon removal. Several state variables are involved which render process monitoring a demanding task, as in most biotechnological processes, measurement of primary variables such as microorganism, carbon and nitrogen concentrations is either difficult or expensive. An alternative is to use a process model of reduced order for on-line inference of state variables based on secondary process measurements, e.g. pH and redox potential. In this work, two modeling approaches were investigated: a generic reduced order model based on the generally accepted IAWQ No. 1 Model [M. Henze, C.P.L., Grady, W., Gujer, G.V.R., Marais, T., Matsuo, Water Res. 21 (5) (1987) 505-515]-generic model (GM), and a reduced order model specially validated with the data acquired from a benchscale sequential batch reactor (SBR) specific model (SM). Model inaccuracies and measurement errors were compensated for with a Kalman filter structure to develop two state observers: one built with GM, the generic observer (GO), and another based on SM, the specific observer (SO). State variables estimated by GM, SM, GO and SO were compared to experimental data from the SBR unit. GM gave the worst performance while SM predictions presented some model to data mismatch. GO and SO, on the other hand, were both in very good agreement with experimental data showing that filters add robustness against model errors, which reduces the modeling effort while assuring adequate inference of process variables.  相似文献   

16.
A laboratory scale experiment was described in this paper to enhance biological nitrogen removal by simultaneous nitrification and denitrification (SND) via nitrite with a sequencing batch biofilm reactor (SBBR). Under conditions of total nitrogen (TN) about 30 mg/L and pH ranged 7.15–7.62, synthetic wastewater was cyclically operated within the reactor for 110 days. Optimal operation conditions were established to obtain consistently high TN removal rate and nitrite accumulation ratio, which included an optimal temperature of 31 °C and an aeration time of 5 h under the air flow of 50 L/h. Stable nitrite accumulation could be realized under different temperatures and the nitrite accumulation ratio increased with an increase of temperature from 15 to 35 °C. The highest TN removal rate (91.9%) was at 31 °C with DO ranged 3–4 mg/L. Process control could be achieved by observing changes in DO and pH to judge the end-point of oxidation of ammonia and SND.  相似文献   

17.
Nutrient removal and sludge age in a sequencing batch reactor   总被引:1,自引:0,他引:1  
The aim of this work was to establish a relation between the mean cellular retention time and the ability of activated sludge to remove phosphate and ammonium. A sequencing batch reactor (SBR) with a total volume of 1.94 m3 was fed with municipal wastewater and was operated under four different organic loading rates to obtain sludge ages of 23, 16, 6, and 3 days. The operational strategy included fill, anaerobic, aerobic, settling and draw phases. The experimental work lasted 445 days. Biological phosphate removal was achieved with sludge ages from 6 to 23 days. The highest PO4-P removal rate observed was of 98% and corresponds to a 16-day sludge age; phosphate removal increased with the sludge age. A sludge age of 3 days resulted in a chemical oxygen demand (COD) removal rate of 81% and a sludge age of 23 days in a removal rate of 99%. Full nitrification was observed with a sludge age of 16 days. Nitrification increased with the sludge age. The 3-day sludge age did not allow nitrification. The phosphate concentrations in the biomass were inversely proportional to the sludge age.  相似文献   

18.
Nutrients in piggery wastewater with high organic matter, nitrogen (N) and phosphorus (P) content were biologically removed in a sequencing batch reactor (SBR) with anaerobic, aerobic and anoxic stages. The SBR was operated with 3 cycles/day, temperature 30 degrees C, sludge retention time (SRT) 1 day and hydraulic retention time (HRT) 11 days. With a wastewater containing 1500 mg/l ammonium and 144 mg/l phosphate, a removal efficiency of 99.7% for nitrogen and 97.3% for phosphate was obtained. Experiments set up to evaluate the effect of temperature on the process showed that it should be run at temperatures higher than 16 degrees C to obtain good removals (> 95%). Batch tests (ammonia utilization rate, nitrogen utilization rate and oxygen utilization rate) proved to be good tools to evaluate heterotrophic and autotrophic biomass activity. The SBR proved to be a very flexible tool, and was particularly suitable for the treatment of piggery wastewater, characterized by high nutrient content and by frequent changes in composition and therefore affecting process conditions.  相似文献   

19.
Sequencing batch reactors (SBRs) have several advantages, such as a lower footprint and a higher flexibility, compared to biofilm based reactors, such as rotating biological contactors. However, the critical parameters for a fast start-up of the nitrogen removal by oxygen-limited autotrophic nitrification/denitrification (OLAND) in a SBR are not available. In this study, a low critical minimum settling velocity (0.7 m h−1) and a low volumetric exchange ratio (25%) were found to be essential to ensure a fast start-up, in contrast to a high critical minimum settling velocity (2 m h−1) and a high volumetric exchange ratio (40%) which yielded no successful start-up. To prevent nitrite accumulation, two effective actions were found to restore the microbial activity balance between aerobic and anoxic ammonium-oxidizing bacteria (AerAOB and AnAOB). A daily biomass washout at a critical minimum settling velocity of 5 m h−1 removed small aggregates rich in AerAOB activity, and the inclusion of an anoxic phase enhanced the AnAOB to convert the excess nitrite. This study showed that stable physicochemical conditions were needed to obtain a competitive nitrogen removal rate of 1.1 g N L−1 d−1.  相似文献   

20.
The supernatant from mesophilic anaerobic digestion of piggery wastewater is characterised by a high amount of COD (4.1 g COD L(-1)), ammonium (2.3g NH(4)(+)-NL(-1)) and suspended solids (2.5 g SS L(-1)). This effluent can be efficiently treated by means of a Sequencing Batch Reactor (SBR) strategy for biological COD, SS and nitrogen removal including a Coagulation/Flocculation step. Total COD and SS reduction yields higher than 66% and 74%, respectively, and a total nitrogen removal (via nitrite) of more than 98% were reached when working with HRT 2.7 days, SRT 12 days, temperature 32 degrees C, three aerobic/anoxic periods, without external control of pH and under limited aeration flow. The inhibition of nitrite oxidizing biomass was achieved by the working free ammonia concentration and the restricted air supply (dissolved oxygen concentration below 1 mg O(2)L(-1)). Since a part of the total COD was colloidal and/or refractory, a Coagulation/Flocculation step was implemented inside the SBR operating strategy to meet a suitable effluent quality to be discharged. Several Jar-Tests demonstrated that the optimal concentration of FeCl(3) was 800 mg L(-1). A respirometric assay showed that this coagulant dosage did not affect the biological activity of nitrifying/denitrifying biomass.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号