首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
2.
In this paper, we study job shop-like flexible manufacturing systems (FMSs) with a discrete material handling system (MHS). In such FMSs, the MHS is a critical device, the unavailability of which may induce transfer blockings of the machines. The FMS devices therefore are hierarchically structured into primary and secondary devices to manage such blocking and avoid deadlocks in these FMSs. For evaluating the quantitative steady-state performance of such FMSs, we propose an analytical queueing network model that relies on an approximate method proposed for analyzing computer systems with simultaneous possessions of resources. Such a model is obtained using the concept of passive resources and by aggregating the FMS workload data so that models are much more tractable. The analytical results are validated against discrete event simulation and shown to be very encouraging. We also show how to increase their robustness, especially under light workload conditions, by modifying an assumption of the method concerning service time distributions.  相似文献   

3.
4.
Flexible manufacturing Systems (FMSs) typically operate at 70–80% utilization, which is much higher than the utilization of traditional machines that can operate with as low as 20% utilization. A result is that an FMS may incur four times more wear and tear than a traditional system. This requests the execution of effective maintenance plans on FMSs. While maintenance actions can reduce the effects of breakdowns due to wear-outs, random failures are still unavoidable. It is important to understand the implications of a given maintenance plan on an FMS before its implementation. This paper discusses a procedure that combines simulation and analytical models to analyze the effects of corrective, preventive, and opportunistic maintenance policies on the performance of an FMS. The FMS performance is measured by its operational availability index, which is determined using the production output rate of the FMS under a variety of time between failure distributions and different operational conditions. The effects of various maintenance policies on FMS performance are simulated and the results are compared to determine the best policy for a given system.  相似文献   

5.
We present an analytical model for performance prediction of flexible manufacturing systems (FMSs) with a single discrete material-handling device (MHD). This configuration of FMS is significant for many reasons: it is commonly found in industry, it simplifies material-handling control, it is amenable to analytical modeling, and it forms a building block for more complex systems. Standard queueing models are inadequate to analyze this configuration because of the need to take into consideration many nontrivial issues such as state-dependent routing, interference from the MHD, and the analysis of the MHD. To account for state-dependent routing, we develop an iterative method that is built around mean value analysis. To analyze the MHD interference, we use two queueing network models. In the first, we ignore queueing at the MHD but model the interference from the MHD by inflating the station service times. The second network models the queueing for the MHD and estimates the blocking (inflation) times needed for the first model. By iterating between the two networks, we are able to predict the performance of this configuration of FMS. Our analytical estimates are validated against discrete event simulation and shown to be quite accurate for initial system design.  相似文献   

6.
Through radical redesign of business processes and systems, policies, and organizational structures, the business process reengineering (BPR) effort was initiated in the manufacturing industry to seek performance breakthroughs. This paper describes a novel approach to the BPR, which applies flexible manufacturing systems (FMSs) design and analysis technologies, such as simulation, multicriteria decision support, and artificial intelligence (AI). These technologies are integrated to design and analyze specific FMS models related to the proposed technical and managerial changes in an industrial case. First, the literature is reviewed to obtain an understanding of the BPR concept and the role of FMS design and analysis in BPR. Second, a decision-making support system is developed to illustrate how the FMS design and analysis would affect BPR. Finally, a summary of the integrated approach practice in industry and conclusions are presented. The paper shows that the key to a successful BPR approach is the identification and analysis of specific proposed models. It also demonstrates that the integrated approach enables engineers to improve the efficiency of BPR.  相似文献   

7.
The increased use of flexible manufacturing systems to provide customers with diversified products efficiently has created a significant set of operational challenges for managers. This technology poses a number of decision problems that need to be solved by researchers and practitioners. In the literature, there have been a number of attempts to solve design and operational problems. Special attention has been given to machine loading problems, which involve the assignment of job operations and allocation of tools and resources to optimize specific measures of productivity. Most existing studies focus on modeling the problem and developing heuristics in order to optimize certain performance metrics rather than on understanding the problem and the interaction between the different factors in the system. The objective of this paper is to study the machine loading problem. More specifically, we compare operation aggregation and disaggregation policies in a random flexible manufacturing system (FMS) and analyze its interaction with other factors such as routing flexibility, sequencing flexibility, machine load, buffer capacity, and alternative processing-time ratio. For this purpose, a simulation study is conducted and the results are analyzed by statistical methods. The analysis of results highlights the important factors and their levels that could yield near-optimal system performance.  相似文献   

8.
The design and evaluation of AGV-based material handling systems are highly complex because of the randomness and the large number of variables involved. Vehicle travel time is a fundamental parameter for solving various flexible manufacturing system (FMS) design problems. This article presents stochastic vehicle travel time models for AGV-based material handling systems with emphasis on the empty travel times of vehicles. Various vehicle dispatching rules examined here include the nearest vehicle selection rule and the longest idle vehicle selection rule. A simulation experiment is used to evaluate and demonstrate the presented models.  相似文献   

9.
A fundamental decision in designing a flexible manufacturing system (FMS) is the number and types of tools (cutters) to provide for system operation. This tool provisioning decision becomes especially important when space and equipment must be provided for refurbishing and storing tools within the FMS. In this article, we describe in detail the tool provisioning problem for a particular application, discuss approaches to making the tool provisioning decision, and explain why analytic models for this problem may be difficult to develop.  相似文献   

10.
Can the cause of aggregation be inferred from species distributions?   总被引:2,自引:0,他引:2  
Species distributions often show an aggregated pattern, which can be due to a number of endo- and exogenous factors. While autologistic models have been used for modelling such data with statistical rigour, little emphasis has been put on disentangling potential causes of aggregation. In this paper we ask whether it is possible to infer sources of aggregation in species distributions from a single set of occurrence data by comparing the performance of various autologistic models. We create simulated data sets, which show similar occupancy patterns, but differ in the process that causes the aggregation. We model the distribution of these data with various autologistic models, and show how the relative performance of the models is sensitive to the factor causing aggregation in the data. This information can be used when modelling real species data, where causes of aggregation are typically unknown. To illustrate, we use our approach to assess the potential causes of aggregation in data of seven bird species with contrasting statistical patterns. Our findings have important implications for conservation, as understanding the mechanisms that drive population fluctuations in space and time is critical for the development of effective management actions for long-term conservation.  相似文献   

11.
Early flexible manufacturing system (FMS) production planning models exhibited a variety of planning objectives; typically, these objectives were independent of the overall production environment. More recently, some researchers have proposed hierarchical production planning and scheduling models for FMS. In this article, we examine production planning of FMS in a material requirements planning (MRP) environment. We propose a hierarchical structure that integrates FMS production planning into a closed-loop MRP system. This structure gives rise to the FMS/MRP rough-cut capacity planning (FMRCP) problem, the FMS/MRP grouping and loading (FMGL) problem, and the FMS/MRP detailed scheduling problem. We examine the FMRCP and FMGL problems in detail and present mathematical programming models for each of these problems. In particular, the FMRCP problem is modeled as a generalized assignment problem (GAP), and a GAP-based heuristic procedure is defined for the problem. We define a two-phase heuristic for the FMGL problem and present computational experience with both heuristics. The FMRCP heuristic is shown to solve problems that exhibit a dependent-demand relation within the FMS and with FMS capacity utilization as high as 99 percent. The FMGL heuristic requires very little CPU time and obtains solutions to the test problems that are on average within 1.5 percent of a theoretical lower bound. This FMS/MRP production planning framework, together with the resulting models, constitutes an important step in the integration of FMS technology with MRP production planning. The hierarchical planning mechanism directly provides for system-level MRP planning priorities to induce appropriate production planning and control objectives on the FMS while simultaneously allowing for necessary feedback from the FMS. Moreover, by demonstrating the tractability of the FMRCP and FMGL problems, this research establishes the necessary groundwork upon which to explore systemwide issues pertaining to the coordination of the hierarchical structure.  相似文献   

12.
Flexible manufacturing systems (FMSs) are a class of automated systems that can be used to improve productivity in batch manufacturing. Four stages of decision making have been defined for an FMS—the design, planning, scheduling, and control stages. This research focuses on the planning stage, and specifically in the area of scheduling batches of parts through the system. The literature to date on the FMS planning stage has mostly focused on the machine grouping, tool loading, and parttype selection problems. Our research carries the literature a step further by addressing the problem of scheduling batches of parts. Due to the use of serial-access material-handling systems in many FMSs, the batch-scheduling problem is modeled for a flexible flow system (FFS). This model explicitly accounts for setup times between batches that are dependent on their processing sequence. A heuristic procedure is developed for this batch-scheduling problem—the Maximum Savings (MS) heuristic. The MS heuristic is based upon the savings in time associated with a particular sequence and selecting the one with the maximum savings. It uses a two-phase method, with the savings being calculated in phase I, while a branch-and-bound procedure is employed to seek the best heuristic solution in phase II. Extensive computational results are provided for a wide variety of problems. The results show that the MS heuristic provides good-quality solutions.  相似文献   

13.

Background

The increased use and costs of specialist child and adolescent mental health services (MHS) urge us to assess the effectiveness of these services. The aim of this paper is to compare the course of emotional and behavioural problems in adolescents with and without MHS use in a naturalistic setting.

Method and Findings

Participants are 2230 (pre)adolescents that enrolled in a prospective cohort study, the TRacking Adolescents'' Individual Lives Survey (TRAILS). Response rate was 76%, mean age at baseline 11.09 (SD 0.56), 50.8% girls. We used data from the first three assessment waves, covering a six year period. Multiple linear regression analysis, propensity score matching, and data validation were used to compare the course of emotional and behavioural problems of adolescents with and without MHS use. The association between MHS and follow-up problem score (β 0.20, SE 0.03, p-value<0.001) was not confounded by baseline severity, markers of adolescent vulnerability or resilience nor stressful life events. The propensity score matching strategy revealed that follow-up problem scores of non-MHS-users decreased while the problem scores of MHS users remained high. When taking into account future MHS (non)use, it appeared that problem scores decreased with limited MHS use, albeit not as much as without any MHS use, and that problem scores with continuous MHS use remained high. Data validation showed that using a different outcome measure, multiple assessment waves and multiple imputation of missing values did not alter the results. A limitation of the study is that, although we know what type of MHS participants used, and during which period, we lack information on the duration of the treatment.

Conclusions

The benefits of MHS are questionable. Replication studies should reveal whether a critical examination of everyday care is necessary or an artefact is responsible for these results.  相似文献   

14.
This paper introduces a generic decision-making framework for assigning resources of a manufacturing system to production tasks. Resources are broadly defined production units, such as machines, human operators, or material handling vehicles; and tasks are activities performed by resources. In the specific context of FMS, resources correspond to individual machines; tasks correspond to operations to be performed on parts. The framework assumes a hierarchical structure of the system and calls for the execution of four consecutive steps to make a decision for the assignment of a resource to a task. These steps are 1) establishment of decision-making criteria, 2) formation of alternative assignments, 3) estimation of the consequences of the assignments, and 4) selection of the best alternative assignment. This framework has been applied to an existing FMS as an operational policy that decides what task will be executed on which resource of this FMS. Simulation runs provide some initial results of the application of this policy. It is shown that the policy provides flexibility in terms of system performance and computational effort.  相似文献   

15.
Hankins and Rovito (1984) examined the impact of different tool policies on cutting tool inventory levels and spindle utilization for a flexible manufacturing system (FMS). This study provides a broader perspective of the impact of tool allocation approaches on flow times, tardiness, percent of orders tardy, machine utilization, and robot utilization. Part type selection procedures have been suggested for the FMS prerelease planning problem. However, very little research has specifically evaluated the part type selection procedures across different tool allocation approaches. Also, with the exception of Stecke and Kim (1988, 1991) no other known study has provided any insights on what tool allocation approaches are appropriate when processing different mixes of part types. This research is devoted to addressing those issues. Three tool allocation approaches, three production scheduling rules, and three levels of part mix are evaluated in this study through a similation model of a flexible manufacturing system. The specific impacts of the tool approaches, their interaction effects with the part type selection rules, and their effectiveness at different part type mix levels are provided through the use of a regression metamodel.  相似文献   

16.
17.
The flexible manufacturing system (FMS) considered in this paper is composed of two CNC machines working in series—a punching machine and a bending machine connected through rollers acting as a buffer system of finite capacity. The main difference between the present problem and the standard two-machine flow shop problem with finite intermediate capacity is precisely the buffer system, which in our problem consists of two stacks of parts supported by rollers: the first stack contains the output of the punching machine, while the second stack contains the input for the bending machine. When the second stack is empty, the first stack may be moved over. Furthermore, the capacity of each stack depends on the particular part type being processed. The FMS can manufacture a wide range of parts of different types. Processing times on the two machines are usually different so that an unbalance results in their total workload. Furthermore, whenever there is a change of the part type in production, the machines must be properly reset—that is, some tools need to be changed or repositioned. A second important difference between the present problem and the usual two-machine flow shop problem is the objective. Given a list ofp part types to be produced in known quantities, the problem considered here is how to sequence or alternate the production of the required part types so as to achieve various hierarchical targets: minimize the makespan (the total time needed to complete production) and, for instance, compress the idle periods of the machine with less workload into a few long enough intervals that could be utilized for maintenance or other reasons. Although Johnson's rule is optimal in some particular cases, the problem addressed in the paper isNP-hard in general: heuristic procedures are therefore provided.  相似文献   

18.
The device performance of polymer solar cells (PSCs) is strongly dependent on the blend morphology. One of the strategies for improving PSC performance is side‐chain engineering, which plays an important role in controlling the aggregation properties of the polymers and thus the domain crystallinity/purity of the donor–acceptor blends. In particular, for a family of high‐performance donor polymers with strong temperature‐dependent aggregation properties, the device performances are very sensitive to the size of alkyl chains, and the best device performance can only be achieved with an optimized odd‐numbered alkyl chain. However, the synthetic route of odd‐numbered alkyl chains is costly and complicated, which makes it difficult for large‐scale synthesis. Here, this study presents a facile method to optimize the aggregation properties and blend morphology by employing donor polymers with a mixture of two even‐numbered, randomly distributed alkyl chains. In a model polymer system, this study suggests that the structural and electronic properties of the random polymers comprising a mixture of 2‐octyldodecyl and 2‐decyltetradecyl alkyl chains can be systematically tuned by varying the mixing ratio, and a high power conversion efficiency (11.1%) can be achieved. This approach promotes the scalability of donor polymers and thus facilitates the commercialization of PSCs.  相似文献   

19.
Deadlock-free operation of flexible manufacturing systems (FMSs) is an important goal of manufacturing systems control research. In this work, we develop the criteria that real-time FMS deadlock-handling strategies must satisfy. These criteria are based on a digraph representation of the FMS state space. Control policies for deadlock-free operation are characterized as partitioning cuts on this digraph. We call these structural control policies (SCPs) because, to avoid deadlock, they must guarantee certain structural properties of the subdigraph containing the empty state; namely, that it is strongly connected. A policy providing this guarantee is referred to as correct. Furthermore, an SCP must be configurable and scalable; that is, its correctness must not depend on configuration-specific system characteristics and it must remain computationally tractable as the FMS grows in size. Finally, an SCP must be efficient; that is, it must not overly constrain FMS operation. We formally develop and define these criteria, formulate guidelines for developing policies satisfying these criteria, and then provide an example SCP development using these guidelines. Finally, we present an SCP that guarantees deadlock-free buffer space allocation for FMSs with no route restrictions.  相似文献   

20.
This paper presents a hierarchical approach to scheduling flexible manufacturing systems (FMSs) that pursues multiple performance objectives and considers the process flexibility of incorporating alternative process plans and resources for the required operations. The scheduling problem is solved at two levels: the shop level and the manufacturing system level. The shop level controller employs a combined priority index developed in this research to rank shop production orders in meeting multiple scheduling objectives. To overcome dimensional complexity and keep a low level of work-in-process inventory, the shop controller first selects up to three production orders with the highest ranking as candidates and generates all possible release sequences for them, with or without multitasking. These sequences are conveyed to the manufacturing system controller, who then performs detailed scheduling of the machines in the FMS using a fixed priority heuristic for routing parts of multiple types while considering alternative process plans and resources for the operations. The FMS controller provides feedback to the shop controller with a set of suggested detailed schedules and projected order completion times. On receiving these results, the shop controller further evaluates each candidate schedule using a multiple-objective function and selects the best schedule for execution. This allows multiple performance objectives of an FMS to be achieved by the integrated hierarchical scheduling approach.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号