首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
A simple, efficient and cost-effective method for municipal wastewater treatment is examined in this paper. The municipal wastewater is treated using an upflow anaerobic sludge bed (UASB) reactor followed by flash aeration (FA) as the post-treatment, without implementing aerobic biological processes. The UASB reactor was operated without recycle, at hydraulic retention time (HRT) of 8 h and achieved consistent removal of BOD, COD and TSS of 60-70% for more than 12 months. The effect of FA on UASB effluent post-treatment was studied at different HRT (15, 30 and 60 min) and dissolved oxygen (DO) concentrations (low DO = 1-2 mg/L and high DO = 5-6 mg/L). The optimum conditions for BOD, COD and sulfide removal were 30-60 min HRT and high DO concentration inside the FA tank. The final effluent after clarification was characterized by BOD and COD values of 28-35 and 50-58 mg/L, respectively. Sulfides were removed by more than 80%, but the fecal coliform only by ~2 log. The UASB followed by FA is a simple and efficient process for municipal wastewater treatment, except for fecal coliform, enabling water and nutrients recycling to agriculture.  相似文献   

2.
A 96 m3 UASB reactor was operated for 2.5 years under different conditions to assess the feasibility of treating strong sewage (COD(tot) = 1531 mg/l) at ambient temperatures with averages of 18 and 25 degrees C for winter and summer respectively. During the first year, the reactor was operated as a two-stage system at OLRs in the range of 3.6-5.0 kg COD/m3 d for the first stage and 2.9-4.6 kg COD/m3 d for the second stage. The results of the first stage showed average removals of 51% and 60% for COD(tot) and COD(ss) respectively without significant effect of temperature. The second stage reactor was unstable. The temperature affected sludge stabilization. During the second year, the first stage was operated as a single-stage UASB reactor at half of the previous loading rates. The results showed an average removal efficiency of 62% for COD(tot) during summer, while it dropped to 51% during wintertime. However, the effluent suspended solids were stabilized with VSS/TSS ratio around 0.50 all over the year. The sludge in the single-stage reactor was well-stabilized and exerted an excellent settlability. During the last three months of research, sludge was discharged regularly from the single-stage UASB reactor. The results showed no significant improvement in the performance in terms of COD(tot). Based on the results of the experiment, a single-stage UASB reactor operated at relatively long HRT is preferred above two-stage system at the Jordanian conditions.  相似文献   

3.
A pilot-scale experiment of a down-flow hanging sponge (DHS) reactor for treatment of low-strength municipal wastewater was conducted over 1 year in Bangkok, Thailand, to establish an appropriate method for treatment under tropical climate conditions. Municipal wastewater with an average BOD of 19 mg/L was fed directly into the DHS reactor. Superior effluent quality (5.1 ± 3.4 mg/L TSS, 21.1 ± 9.0 mg/L COD, 2.8 ± 1.4 mg/L BOD, and 4.1 ± 1.0 mg/L TN) was achieved at a hydraulic retention time (HRT) of 1 h under an average temperature of 30 °C. The DHS reactor reached an actual HRT of 19.0 min, indicating good contact efficiency between wastewater and retained sludge. The DHS reactor retained dense sludge at 15.3–26.4 g VSS/L based on the sponge media volume. The sludge activity in terms of specific oxygen uptake rate was good. Excess sludge was produced as 0.051 g TSS/g COD removed (0.11 g TSS/g BOD removed), and a good SVI of 28 mL/g was observed. The sufficient performance was attributed to dense sludge with high activity, regardless of the low-strength wastewater. Overall, the DHS was advantageous owing to its simple operation, lack of operational problems, and low power consumption.  相似文献   

4.
The performance of a full-scale upflow anaerobic sludge blanket (UASB) reactor treating brewery wastewater was investigated by microbial analysis and kinetic modelling. The microbial community present in the granular sludge was detected using fluorescent in situ hybridization (FISH) and further confirmed using polymerase chain reaction. A group of 16S rRNA based fluorescent probes and primers targeting Archaea and Eubacteria were selected for microbial analysis. FISH results indicated the presence and dominance of a significant amount of Eubacteria and diverse group of methanogenic Archaea belonging to the order Methanococcales, Methanobacteriales, and Methanomicrobiales within in the UASB reactor. The influent brewery wastewater had a relatively high amount of volatile fatty acids chemical oxygen demand (COD), 2005 mg/l and the final COD concentration of the reactor was 457 mg/l. The biogas analysis showed 60–69 % of methane, confirming the presence and activities of methanogens within the reactor. Biokinetics of the degradable organic substrate present in the brewery wastewater was further explored using Stover and Kincannon kinetic model, with the aim of predicting the final effluent quality. The maximum utilization rate constant U max and the saturation constant (K B) in the model were estimated as 18.51 and 13.64 g/l/day, respectively. The model showed an excellent fit between the predicted and the observed effluent COD concentrations. Applicability of this model to predict the effluent quality of the UASB reactor treating brewery wastewater was evident from the regression analysis (R 2?=?0.957) which could be used for optimizing the reactor performance.  相似文献   

5.
Wastewater from a food-manufacturing plant with a low concentration of organic matter below 100 mg/l TOC was first treated at 37°C in an anaerobic fluidized-bed reactor (AFBR) or in an upflow anaerobic sludge blanket (UASB). The TOC removal efficiency in both reactors decreased from 85% to 65% as the influent TOC concentration decreased from 100 to 35 mg/l at a hydraulic retention time (HRT) of 6 h. Treatment at an HRT of 4 h resulted in an effluent TOC concentration of 11 to 15 mg/l. The concentration of suspended solids in the effluent could be reduced to 20 mg/l, which corresponded to 7% of that of the influent. The effluent from both reactors was then treated anaerobically in a fixed-bed reactor system. The TOC concentration and optical density (OD) of the effluent from the aerobic treatment were reduced to 5 mg/l and 0.005, respectively, at an HRT of 2 h. When anaerobically or aerobically treated effluent was passed over an activated carbon column, the effluent TOC concentration was reduced to 2 to 3 mg/l. The conductivity of 1.3 mS/cm in raw wastewater, which was not removed through the above treatments, was reduced to 0.001 mS/cm on an ion-exchange resin column. An effluent quality corresponding to that of ultra-pure water for industrial use was finally attained by the treatment in this multi-step system.  相似文献   

6.
A novel polyethylene glycol (PEG) gel was fabricated and used as a carrier to immobilize Clostridium sp. LS2 for continuous hydrogen production in an upflow anaerobic sludge blanket (UASB) reactor. Palm oil mill effluent (POME) was used as the substrate carbon source. The optimal amount of PEG-immobilized cells for anaerobic hydrogen production was 12% (w/v) in the UASB reactor. The UASB reactor containing immobilized cells was operated at varying hydraulic retention times (HRT) that ranged from 24 to 6 h at 3.3 g chemical oxygen demand (COD)/L/h organic loading rate (OLR), or at OLRs that ranged from 1.6 to 6.6 at 12 h HRT. The best volumetric hydrogen production rate of 336 mL H2/L/h (or 15.0 mmol/L/h) with a hydrogen yield of 0.35 L H2/g CODremoved was obtained at a HRT of 12 h and an OLR of 5.0 g COD/L/h. The average hydrogen content of biogas and COD reduction were 52% and 62%, respectively. The major soluble metabolites during hydrogen fermentation were butyric acid followed by acetic acid. It is concluded that the PEG-immobilized cell system developed in this work has great potential for continuous hydrogen production from real wastewater (POME) using the UASB reactor.  相似文献   

7.
The primary objective of this study was to evaluate the effects of the organic loading rate on the performance of an up-flow anaerobic sludge blanket (UASB) reactor treating olive mill effluent (OME), based on the following indicators: (i) chemical oxygen demand (COD) removal efficiency; and (ii) effluent variability (phenol, suspended solids, volatile fatty acids, and pH stability). The UASB reactor was operated under different operational conditions (OLRs between 0.45 and 32 kg COD/m3·day) for 477 days. The results demonstrated that the UASB reactor could tolerate high influent COD concentrations. Removal efficiencies for the studied pollution parameters were found to be as follows: COD, 47∼92%; total phenol, 34∼75%; color, 6∼46%; suspended solids, 34∼76%. The levels of VFAs in the influent varied between 310 and 1,750 mg/L. Our measurements of the VFA levels indicated that some of the effluent COD could be attributed to VFAs (principally acetate, butyrate, iso-butyrate, and propionate) in the effluent, which occurred at levels between 345 and 2,420 mg/L. As the OLRs were increased, more VFAs were measured in the effluent. A COD removal efficiency of 90% could be achieved as long as OLR was kept at a level of less than 10 kg COD/m3·day. However, a secondary treatment unit for polishing purposes is necessary to comply with discharge standards.  相似文献   

8.
A pilot-scale hybrid hydrolysis acidification reactor (HHAR) with periodic water allocation mode operation followed by sequencing batch reactor (SBR) in anoxic and aerobic metabolic function was evaluated for the treatment of low-biodegradable combined industrial and domestic wastewater. The HHAR combines the advantages of both the UASB reactor and AF, omitting the three-phase separator. Furthermore, it has lower average up-flow velocity (0.38–0.92 m/h) and higher periodic up-flow velocity (6 m/h), which made the reactor keep higher MLSS concentration (more than 10,000 mg/L) and sludge-bed is in periodic “expansion-sedimentation-expansion” state. When HRT less than 10 h, the B/C variation was positive and reached the maximum value of 0.07 at 8 h. SBR with a total cycle period of 4.5 h was applied as the post-treatment process to remove residual COD, NH3-N and TN. At steady stage, the pilot-scale SBR effluent COD, NH3-N and TN concentration was 65, 0.75 and 17.71 mg/L, corresponding in this case to full-scale SBR plant effluent was 93, 16.4 and 34 mg/L. Comparison results indicated that the application of HHAR–SBR system to treat combined industrial and domestic wastewater can improve effluent quality significantly.  相似文献   

9.
Treatment of simulated wastewater containing 40 mg/l of 4-chlorophenol (4-CP) was carried out in an upflow anaerobic sludge blanket (UASB) reactor under methanogenic condition. The performance of this test UASB reactor was evaluated in terms of 4-CP removal. Hydraulic retention time (HRT) and substrate:co-substrate ratio for the 4-CP removal was optimized by varying the influent flow rate (13-34.7 ml/min) and sodium acetate concentration (2-5 g/l), respectively. A control UASB reactor, which was not exposed to 4-CP was also operated under similar conditions. Organic loading rate (OLR) was varied in the range of 2-5.3 kg/m(3)/d and 1.7-4.2 kg/m(3)/d, respectively, for HRT and substrate:co-substrate ratio studies, respectively. The optimum HRT and substrate:co-substrate ratio for the removal of 4-CP was 12h and 1:75, respectively. Removal of 4-CP achieved at optimum HRT and substrate:co-substrate ratio was 88.3+/-0.7%. Removal of 4-CP occurred through dehalogenation and caused increase in chloride ion concentration in the effluent by 0.23-0.27 mg/mg 4-CP removed. The ring cleavage test showed the ortho mode of ring cleavage of 4-CP. Change in the elemental composition of the anaerobic biomass of UASB reactors was observed during the study period. Concentration of Ca(2+) increased in the biomass and this could be attributed to the biosoftening. Specific methanogenic activity of the sludge of control and test UASB reactor was 0.832 g CH(4) COD/g VSS d and 0.694 g CH(4) COD/g VSS d, respectively.  相似文献   

10.
The objective of this study was to analyze the factors affecting the performance of partial nitrification in a sequencing batch reactor. During a 140-day long-term operation, influent pH value, dissolved oxygen (DO), and chemical oxygen demand/nitrogen (COD/N) ratio were selected as operating factors to evaluate the maintenance and recovery of nitrite accumulation. Results showed that high DO concentration (2–4 mg/L) could damage nitrite accumulation immediately. However, nitrite accumulation ratio (NAR) could be increased from 1.68?±?1.51 to 35.46?±?7.86 % when increasing the pH values from 7.5 to 8.3 due to the increased free ammonia concentration. Afterwards, stable partial nitrification and high NAR could be recovered when the reactor operated under low DO concentration (0.5–1.0 mg/L). However, it required a long time to recover the partial nitrification of the reactor when the influent COD/N ratios were altered. Fluorescence in situ hybridization analysis implied that ammonium oxidizing bacteria were completely recovered to the dominant nitrifying bacteria in the system. Meanwhile, sludge volumetric index of the reactor gradually decreased from 115.6 to 56.6 mL/g, while the mean diameter of sludge improved from74.57 to 428.8 μm by using the strategy of reducing settling time. The obtained results could provide useful information between the operational conditions and the performance of partial nitrification when treating nitrogen-rich industrial wastewater.  相似文献   

11.
Leachate treatment is a challenging issue due to its high pollutant loads. There are several studies on feasible treatment methods of leachate. In the scope of this study, high organic content of young leachate was eliminated using an upflow anaerobic sludge blanket (UASB) and a membrane bioreactor (MBR) in sequence and effluent of the system was given to single reactor for high activity ammonia removal over nitrite (SHARON) and anaerobic ammonia oxidation (Anammox) reactors to remove nitrogen content. All reactors were set up at lab scale in order to evaluate the usage of these processes in sequencing order for leachate treatment. COD and TKN removal efficiencies were over 90 % in the combined processes which were operated during the study. The biodegradable portion of organic matter was removed with an efficiency of 99 %. BOD5 concentration decreased to 50 mg/L by UASB and MBR in sequence even the influent BOD5 concentration was over 8,000 mg/L. Although high nitrogen concentrations were observed in raw leachate, successful removal of nitrogen was accomplished by consecutive operations of SHARON and Anammox reactors. The results of this study demonstrated that with an efficient pretreatment of leachate, the combination of SHARON–Anammox processes is an effective method for the treatment of high nitrogen content in leachate.  相似文献   

12.
The performance of a laboratory-scale sewage treatment system composed of an up-flow anaerobic sludge blanket (UASB) reactor and a moving bed biofilm reactor (MBBR) at a temperature of (22–35 °C) was evaluated. The entire treatment system was operated at different hydraulic retention times (HRT’s) of 13.3, 10 and 5.0 h. An overall reduction of 80–86% for CODtotal; 51–73% for CODcolloidal and 20–55% for CODsoluble was found at a total HRT of 5–10 h, respectively. By prolonging the HRT to 13.3 h, the removal efficiencies of CODtotal, CODcolloidal and CODsoluble increased up to 92, 89 and 80%, respectively. However, the removal efficiency of CODsuspended in the combined system remained unaffected when increasing the total HRT from 5 to 10 h and from 10 to 13.3 h. This indicates that, the removal of CODsuspended was independent on the imposed HRT. Ammonia-nitrogen removal in MBBR treating UASB reactor effluent was significantly influenced by organic loading rate (OLR). 62% of ammonia was eliminated at OLR of 4.6 g COD m−2 day−1. The removal efficiency was decreased by a value of 34 and 43% at a higher OLR’s of 7.4 and 17.8 g COD m−2 day−1, respectively. The mean overall residual counts of faecal coliform in the final effluent were 8.9 × 104 MPN per 100 ml at a HRT of 13.3 h, 4.9 × 105 MPN per 100 ml at a HRT of 10 h and 9.4 × 105 MPN per 100 ml at a HRT of 5.0 h, corresponding to overall log10 reduction of 2.3, 1.4 and 0.7, respectively. The discharged sludge from UASB–MBBR exerts an excellent settling property. Moreover, the mean value of the net sludge yield was only 6% in UASB reactor and 7% in the MBBR of the total influent COD at a total HRT of 13.3 h. Accordingly, the use of the combined UASB–MBBR system for sewage treatment is recommended at a total HRT of 13.3 h.  相似文献   

13.
The catalytically oxidized olive mill wastewater (OMW) was subjected to continuous anaerobic treatment using two treatment schemes. The 1st step in both schemes was an up-flow anaerobic sludge blanket (UASB) reactor (2 0 l). The 2nd step was either a hybrid UASB reactor or a classical one (1 0 l, each). The 1st stage was operated at constant hydraulic retention time (HRT) of 24 h. The organic loading rate (OLR) varied from 3.4 to 4.8 kgCOD/m3 d depending on the quality of the pretreated wastewater. The results obtained indicated that, the 1st step UASB reactor achieved a COD percentage removal value of 53.9%. Corresponding total BOD5 and TSS removal were 51.5% and 68.3%, respectively.The results obtained indicated that the hybrid UASB reactor as a 2nd step produced better quality effluent as compared to the classical one. This could be attributed to the presence of the packing curtain sponge with active biomass in the sedimentation part of hybrid UASB reactor which minimizes suspended solids washout, consequently enhancement of the efficiency of the reactor.Available data showed that a two stage system consisting of a classical and a hybrid UASB reactor operated at a total HRT of 48 h and OLR of 2.0 kgCOD/m3 d provided promising results. Removal values of CODtotal, BOD5 total, TOC, VFA, oil and grease were 83%, 84%, 81%, 93% and 81%, respectively. Based on the available data, the use of a two stage anaerobic system consisting of a classical UASB reactor followed by a hybrid UASB as a post-treatment step for catalytically oxidized OMW is recommended.  相似文献   

14.
The performance and biomass retention of an upflow anaerobic sludge bed (UASB) reactor treating liquid fraction of dairy manure has been investigated at several organic loading rates. Two identical UASB reactors were employed. The biomass of one UASB reactor (FBR) had previously been treated with a cationic polyacrylamide, the other reactor was operated as a control reactor (CR). At 3 and 2 days of HRT both reactors functioned similarly, but at 1.5 days HRT some differences were observed between both effluents. Mean COD(T) removal percentages were 83.4% and 76.5%; COD(VFA) values in effluents were 977 and 2682 mg l(-1) for the FBR and the CR respectively. The VSS initial value in both reactors was 25.66 g VSS, whereas after the experiment the quantities were 31.83 g VSS in the FBR and 23.18 g VSS in the CR reactors. Polymer addition resulted in a higher degree of biomass retention and better performance in the FBR reactor.  相似文献   

15.
The objective of this work was to evaluate the post-treatment of an anaerobic recalcitrant effluent (anaerobically-treated weak black liquor, AnE) in an aerobic, upflow reactor packed with “biocubes” of Trametes versicolor immobilized onto small cubes of holm oak wood. The treated effluent (named anaerobic effluent; AnE) from an anaerobic fluidized bed reactor was fed to an up-flow aerobic fungal packed bed reactor (PBR). Two HRT were tested in this unit, namely 5 and 2.5 days; the PBR operated 60 days at 5-day HRT and 35 days at 2.5-day HRT. The aerobic packed bench scale reactor was a glass column 1.5 L total geometric volume containing 0.75 L biocubes of T. versicolor immobilized onto holm oak wood small cubes of 5 mm side. The reactor was operated at 25 °C. The pH of the AnE was adjusted to 4.5 before feeding; no carbohydrates or other soluble carbon source was supplemented. The fungal packed bed bioreactor averaged organic matter removals of 30% and 32% COD basis, during an experimental run of 60 days at 5-day HRT and 35 days at 2.5-day HRT, respectively. Colour and ligninoids contents were removed at higher percentages (69% and 54% respectively, average of both HRT). There was no significant difference between reactor performance at 5- and 2.5-day HRT, so, operation at 2.5-day HRT is recommended since reactor throughput is double. Activity of manganese peroxidase and laccase was found during the entire operation of the fungal PBR whereas lignin peroxidase activity practically disappeared in the second operation period. In general, enzyme activities were higher in the first period of operation (5-day HRT) than at 2.5-day HRT. To the best of our knowledge, this is one of the few works that demonstrated extended performance (3 months) of a fungal bioreactor for the treatment of a recalcitrant wastewater with no supplementation of glucose or other expensive, soluble carbohydrate.  相似文献   

16.
以纸为碳源去除地下水硝酸盐的研究   总被引:13,自引:0,他引:13  
研究了以纸为碳源和反应介质的生物反应器对水中硝酸盐的去除。结果表明,以纸为碳源的反应器启动快.反硝化反应受温度及水力停留时间影响大。25℃的反硝化速率是14℃的1.7倍。在室温25±1℃,进水硝酸盐氮浓度为45.2mg·L^-1、水力停留时间8.6h时,反应器对硝酸盐氮的去除率在99.6%以上,当水力停留时间为7.2h,氮去除率只有50%。反硝化反应受pH值和溶解氧的影响小,反应进行过程中,纸表面形成了生物膜,纸也被消耗了.采用反应器出水再经活性炭吸附的工艺流程处理高硝酸盐氮地下水,<33.9mg·L^-1的硝酸盐氮完全去除,没有出现NC2-N,最终出水水质DOC<11mg·L^-1。  相似文献   

17.
亚硝酸盐型同步厌氧生物脱氮除硫工艺的运行性能   总被引:1,自引:0,他引:1  
蔡靖  郑平 《生物工程学报》2009,25(11):1684-1689
采用上流式厌氧污泥床(UASB)反应器研究了亚硝酸盐型同步厌氧生物脱氮除硫工艺的性能。该工艺具有很高的硫化物和亚硝酸盐转化潜能,最大容积硫化物去除率和容积硝酸盐去除率分别为13.4kg/(m3·d)和2.3kg/(m3·d);所能耐受的最大进水硫化物和亚硝酸盐浓度分别为880mg/L和252.7mg/L;最适进水硫化物和亚硝酸盐浓度分别为460mg/L和132.3mg/L,最适水力停留时间为4h。硫化物和亚硝酸盐的表观半抑制浓度分别为403.9mg/L和120.8mg/L,两者之间的联合毒性为拮抗作用。  相似文献   

18.
Simultaneous nitrification and denitrification (SND) was realized by means of a novel air-lift internal loop biofilm reactor, in which aeration was set in middle of the reactor. During operation, the aeration was adjusted to get appropriate dissolve oxygen (DO) in bulk solution and let aerobic and anoxic zone coexist in one reactor. When aeration was at 0.6 and 0.2 L/min, corresponding to DO of 5.8 and 2.5 mg/L in bulk solution, ammonia nitrogen removal percentage reached about 80 and 90 %, but total nitrogen removal percentage was lower than 25 %. While the aeration was reduced to 0.1 L/min, aerobic and anoxic zones existed simultaneously in one reactor to get 75 % of ammonia nitrogen and 50 % of total nitrogen removal percentage. Biofilms were, respectively, taken from aerobic and anoxic zone to verify their function of nitrification and denitrification in two flasks, in which ammonia nitrogen was transferred into nitrate completely by aerobic biofilm, and nitrate was removed more than 80 % by anoxic biofilm. Microelectrode was used to measure the DO distribution inside biofilms in anoxic zone corresponding to different aerations. When aeration was at 0.6 and 0.2 L/min, DO inside biofilm was more than 1.5 mg/L, but the DO inside biofilm decreased to anoxic status with depth of biofilm increasing corresponding to aeration of 0.1 L/min. The experimental results indicated that SND could be realized because of simultaneous existence of aerobic and anoxic biofilms in one reactor.  相似文献   

19.
The stackable and submergible microbial fuel cell (SS-MFC) system was fabricated consisting of three MFC modules (#1, #2 and #3) that were immersed in an anaerobic tank as a 30 L anode compartment. Each module consisted of the anion exchange membrane–membrane electrode assembly (A-MEA) and cation exchange membrane-MEA (C-MEA). Two MEAs shared a cathode compartment in the module and the three modules shared a anode compartment The SS-MFC system was operated with two phase. After batch feeding (phase I), the system was operated under continuous mode (phase II) with different organic concentrations (from 50 to 1000 mg/L) and different hydraulic retention times (HRT; from 3.4 to 7.2 h). The SS-MFC system successfully produced a stable voltage. A-MEA generated a lower power density than the C-MEA because of the former’s high activation and resistance loss. C-MEA showed a higher average maximum power density (3.16 W/m3) than A-MEA (2.82 W/m3) at 70 mL/min (HRT of 7.2 h). The current density increased as the organic concentration was increased from 70 to 1000 mg/L in a manner consistent with Monod kinetics. When the HRT was increased from 3.4 to 7.2 h, the power densities of the C-MEAs increased from 34.3–40.9 to 40.7–45.7 mW/m2, but those of the A-MEAs decreased from 25.3–48.0 to 27.7–40.9 mW/m2. Although power generation was affected by HRT, organic concentrations, and separator types, the proposed SS-MFC modules can be applied to existing wastewater treatment plants.  相似文献   

20.
This experiment aimed to decolorize Reactive Red 159 using a high potential of a consortium of purple nonsulfur bacteria (PNSB) with an application of response surface methodology through a central composite design in open system. The three factors of hydraulic retention time (HRT), sludge retention time (SRT) and dye concentration were applied to the design. The decolorization was operated in an anaerobic sequencing batch reactor until the system reached to a pseudosteady state for 30?cycles in each experiment. The optimal condition was 6,500?mg/L of Reactive Red 159 concentration with 20 days of SRT and 8 days of HRT, achieving dye effluent of 142.62?±?5.35?mg/L, decolorization rate of 264.54?±?7.13?mg/L/h and decolorization efficiency of 97.68?±?0.74%. The results revealed that PNSB efficiently decolorized the high concentration of Reactive Red 159 and they were a high potential of microorganisms for dyes contaminated wastewater treatment.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号