Simultaneous nitrification and denitrification in a mixed methanotrophic culture |
| |
Authors: | Hee-Ja Lee Jae-Ho Bae Kwang-Myeung Cho |
| |
Affiliation: | (1) Department of Environmental Engineering, Inha University, 253 Yonghyun-dong, Nam-gu, Inchon, 402-751, Republic of Korea |
| |
Abstract: | Simultaneous nitrification and denitrification using a mixed methanotrophic culture was investigated. When both NO3–-N (108 mg l–1) and NH3-N (59 mg l–1) were added into batch reactors, nitrate removal was complete within 10 h at the rate of 47 mg NO3–-N g VSS–1 day–1 when dissolved oxygen (DO) concentration was maintained at 2 mg DO l–1. Ammonia removal started simultaneously with nitrate removal at a slower rate of 14 NH3-N g VSS–1 day–1. No significant accumulation of nitrite or nitrate during ammonia utilization suggested the occurrence of simultaneous nitrification and denitrification. |
| |
Keywords: | denitrification methane methanotrophs nitrification simultaneous nitrification and denitrification |
本文献已被 SpringerLink 等数据库收录! |