首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Removal of naphthalene and phenanthrene using aerobic membrane bioreactor
Authors:Petia Mijaylova Nacheva  Alberto Esquivel Sotelo
Institution:1.Mexican Institute of Water Technology,Jiutepec,Mexico;2.Faculty of Engineering - Campus Morelos,National Autonomous University of Mexico,Jiutepec,Mexico
Abstract:The removal of polycyclic aromatic hydrocarbons by membrane bioreactor (MBR) under aerobic conditions had been studied using naphthalene (NAP) and phenanthrene (PHE) as model compounds. Three MBRs with submerged ultra-filtration hollow fiber membranes were operated applying different operational conditions during 6.5 months. Complete NAP and PHE removal was obtained applying loads of 7 gNAP kgTSS?1 day?1 and 0.5 gPHE kgTSS?1 day?1, while the organic loading rate was adjusted to 0.26 kgCOD kgTSS?1 day?1, with the biomass concentration being 6000 mgTSS L?1, the hydraulic retention time (HRT) 8 h and the solids retention time (SRT) 30 days. Load increases, as well as HRT and SRT reductions, affected the NAP and PHE removals. Biodegradation was found to be the major NAP and PHE removal mechanism. There was no NAP accumulation in the biomass. Low PHE quantities remain sorbed in the biomass and the contribution of the sorption in the removal of this compound was estimated to be less than 0.01 %. The volatilization does not contribute to the PHE removal in MBRs, but the contribution of NAP volatilization can reach up to 0.6 % when HRT of 8 h is applied.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号